CURRENT PROGRESS OF WORK:
The work is progressing well despite the difficulties in achieving materials for the production of concrete that has generated the trucker strike. advances are:
- HOUSING STRUCTURE: is currently finalizing the assembly and cast of the vertical elements of level 4 and while progress is being made with the armed plate Level 5.
- STRUCTURE AREAS: We are finishing the assembly of the ramp that connects the basement 1 with the lobby level, are armed and ready to melt the cover plate lounge and the base plate of the wetland area also is being finalized assembling the walls of the pool.
- Water and sanitation facilities: in the process of installing the plumbing standpipe within Level 2 apartments.
- ELECTRICAL INSTALLATIONS: On Monday , July 25/16, installation work of electrical standpipe into Level 2 apartments start.
- MASONRY HOUSING: currently running tasks in buildings Level 2.
- MASONRY AREAS: They are developing activities in the basement 2, basement 1 and Level 2 lobby level.
- FRISO AREAS: Since work began in the cellar 2.
- UPCOMING ACTIVITIES TO DEVELOP: Fulfilling our programming work being undertaken all necessary to begin soon to Friso, and Painting Housing Stucco work, these activities will be implemented in the month of August / 16.